Pile Foundation Project of Vietnam Ho Chi Minh Communist Youth League Cement Plant of 5000T/D
1. Place: Ho Chi Minh City, Dong Nai Province, Vietnam
2. Time of construction: 2007-2008
3. Types of piles: cast-in-situ bored pile and deep mixed pile
Pile diameter:bored pile Φ 800-1000, pile length 40-50m, deep mixed pile Φ 600-700, pile length 15m
4. Geology: mucky soil, water content reaching 35-40%; 10 sets of type 15 bored piling machines and 2 sets of deep mixed piling machines needed in construction
5. Work Quantity:amount of concrete used in bored piling: 38,000 cubic meters; amount of concrete used in deep mixed piling: 30,000 cubic meters
|
|
|
Pile Foundation Project of Cameroon Bafoussam Stadium
1. Place: Bafoussam, Cameroon
2. Time of construction: 2013
3. Types of piles: rotary digging bored piles, pile diameter: Φ 600, pile length 25-40 m
4. Geology: floury soil, silty clay, medium-weathered limestone 2-4 m strength: 60Mpa
5. Work Quantity:460 piles
|
|
 |
|
|
 |
|
Zhenjiang Jianghehui Pile Foundation Project
1. Place: Changjiang Road, Zhenjiang
2. Time of construction: Aug. to Dec. 2012
3. Types of piles: rotary digging bored piles, 55 layers of building 1, 41 layers of building 2, 30 layers of building and 5 respectively, 28-33 layers of building 7 to building 17, as well as piles used in basement in the whole area; pile diameter: Φ 700-1000, pile length 20-65 m
4. Geology: floury soil, silt clay, strong-weathered and medium-weathered limestone 2-4 m, strength: 40-80Mpa, 6 sets of BG25C piling machines of German Bauer and 26 sets of types 15 and 20 bored piling machines are needed.
|
|
Pile Foundation Project of Russia Basel 5000T/D Cement Plant
1. Place: Shiyue Village, Ryazan Oblast, Russia
2. Time of construction: 2008-2009
3. Types of piles: rotary digging bored piles, pile diameter: Φ 800-1200, pile length 25-50 m
4. Geology: topsoil 2-3m frozen earth, floury soil, silt clay, medium-weathered limestone 2-4 m, strength: 50-70Mpa, 4 sets of BG25C rotary digging piling machines of German Bauer are needed.
5. Work Quantity: 35,000 cubic meters of concrete
|
|
 |
|
 |
|
Pile Foundation Project of Russia Troitsk Power Plant
1. Place: Chelyabinsk, Russia
2. Time of construction: 2011-2012
3. Types of piles: rotary digging bored piles, pile diameter: Φ 800-1200, pile length 15-50 m
4. Geology: topsoil 2-3m frozen earth, silt and sandy soil, medium-weathered limestone 2-4 m, strength: 40-80Mpa, 3 sets of BG25C rotary digging piling machines of German Bauer are needed.
|
|
|